M5 Yerevan-Armavir km18+200 - km37+417 surface rehabilitation
Service
Road and highway construction
Date
2022-2022
Partner
RA Ministry of Territorial Administration and Infrastructure
We have completed the pavement rehabilitation of the 13 km 428 m long section of both left and right lanes of Yerev
an-Armavir road. The rehabilitated sections are located between km 18+200 - km 37+417 of M5 Yerevan-Armavir road.
Asphalt concrete pavement: 295.876 m²