Rehabilitation of the Noravan-Shamb road
Service
Road and highway construction
Date
2023-2023
Partner
RA Ministry of Territorial Administration and Infrastructure
AAB Construction is implementing rehabilitation works on T-8-52 local highway km 8+100-km 10+400 (crossing point with T-8-48) and T-8-48
local highway km 5+600- km 11 +200 (crossing point with T-8-49) sections ensuring the passability and improving the parameters of curves.
The sections of a total of 7.9 km are located on the road from Noravan to Shamb.
The works started in June 2023.