M12 Kornidzor-Republic of Artsakh Border, km 0+000-km 4+000 Road Rehabilitation

Service

Road and highway construction

Date

2022

Partner

RA Ministry of Territorial Administration and Infrastructure

The rehabilitation works of the road connecting Kornidzor with the border of the Republic of Artsakh is in progress. The current plan includes the following volume of works: Earthworks: 74.79

9 m³ Road surfacing: 30.910 m² Road shoulder construction: 15.514 m² Roadside gutters: 3.806 m Road segment: M12 Kornidzor-Republic of Artsakh border, km 0+000-km 4+000 Segment length: 4.000 m

We use Leica Geosystems GNSS machine control systems to maximize the precision of earthworks.